Here we are.  Finally starting to get things done in the bathroom.  Ran the plumbing and electrical.  Got the insulation done and the gas line stubbed in.  Lots to do!



 


We got the bathroom fan installed and wired up.  We had to cut the hole in the roof for the vent.  Cutting holes in Tiny always make my stomach do little flips.









We ran the vent hose through the roof and attached it to the cap. 









All the roof caps we found were black.  We wanted it to match the roof so we painted ours a metallic grey color.









It's hard to see but we used some left over barrier and roofing to cover the vent cap bottom flap.  We sealed it really good with some silicone caulking and used some sealing roof screws as well.  Don't want any leaks!  Had several good days of rain with no signs of leaking.







Time for Pex!  We ran our plumbing in Pex so we wouldn't have a lot of connections on every turn.  Less chance for something to come undone and leak down the road. 











We got the connections made for the sink.  The drain had to be slightly offset due to the steel support beams on the trailer.  Not a big deal.  The cabinet we built for the sink will cover up the drain pipes.  The other connections and gas line are for our tankless propane gas water heater.







The connections made up for the shower and the water shut off valve.  We decided to use a simple on/off valve the Hubby built instead of a mixer valve since our water temperature is controlled by the water heater.  It was easier that running several lines for the mixer valve.











Shower head and shower on/off valve in place.  The industrial look of the on/off valve will go great with the metal sheeting we plan to use in the shower. 












Next up, insulation.  We used Eco-Touch batt insulation for the bathroom as it was such a small space. Glad we went with this new "itch-less" stuff.  I hate fiberglass insulation.  This stuff wasn't bad at all. 



























We used sanded plywood on the ceiling and walls around the sink area.












We used galvanized steel roofing sheets in the shower area.
It had to be cut to match the pitch of the roof line where it starts to slope downward.  Think it turned out pretty well.  














All the seams are sealed with silicone caulking.  The floor and ceiling gaps are filled in and sealed as well.  It reflects light well and makes the space seem bigger when standing in it. 











We build a small cabinet for our tiny sink.  We used the Kreg Jig to build it as you can see from the holes.  No visible screws...YAY!  We stained it a light green color that shows off the grain nicely and matches the paint we used in the bathroom.  We used a good polyurethane sealer and sealed it several times.













There it is with our little Ikea sink mounted on it.  It is mounted to the wall and sits a few inches off the floor to avoid water damage.  I love how the color turned out on the cabinet.












Looking in from the door.  We have out propane hot water heater in place.  It's a Marey 5L unit.

We painted the walls a light green with the trim a darker sage green color.  We used stainless button head screws to tie the painted wood areas in with metal shower walls.









We had bought a bathroom 2 light fixture but when we went to install it, realized it would sit really low.  Hind sight and all that.  We had these two movable lights from Ikea we planned to use in the bedroom so the Hubby hardwired them in and covered the box with a plate.  Quick fixes work for me!













Paint and trim done.  The color looks good with the metal.














Shower head and on/off valve in place and sealed up. 

We still have to get a few more things done.  We have to get all the water lines connected to the hot water tank and it vented out the ceiling.  We also have to get the composting toilet built as well.  It will go in the space next to the sink.  

So there you go.  The bathroom..mostly completed!  I'm just glad we got this much done before the Holidays.  We will be back at it after Christmas.  Still lots to do!

Thanks for following our progress.   Hope everyone has a wonderful Christmas! :)

14 comments:

Mathew Robinson said...

Wow! It's really cool that that is a continuing and constant work. Good one there. I bet the output will be something to be really proud ouf, with the roof being fixed and taken cared of, as well as all the other parts and aspects of it all. Anyway, thanks for sharing that! All the best!

Mathew Robinson @ Browns Roofing Company LLC

Unknown said...

Thanks Mathew. We appreciate the comment and you taking the time to check out our labor of love. We can't wait to finish it up and get moved in. :)

Unknown said...

Hi Chrissy, Happy New Year! I hope you and Ronnie had a great Christmas. Following your guys's progress is like watching a good movie. You know it's coming close to the end but you don't want it to end. You guys are really on the home stretch now eh? I love how you guys used the galvanized roofing on the shower walls...it looks awesome! Can hardly wait to see what you guys do next! Thanks for keeping the blog posts coming :-)

Unknown said...

Hi Travis. We had a good Christmas, thanks for asking. Hope you and yours had a wonderful one also! Here's to hoping the New Year brings us all good times! Thank you for following the blog also. I'm glad you have enjoyed it so far. We are planning to keep the blog running even after we get Tiny done. We can't wait to finish and get moved in but still have so much to do! Bedroom work up next! Planning it out now. :-)

Ned Polian said...

Hi I found your site by mistake when i was searching yahoo for this acne issue, I must say your site is really helpful I also love the design, its amazing!. I don’t have the time at the moment to fully read your site but I have bookmarked it and also add your RSS feeds. I will be back in a day or two. thanks for a great site. plumber

Unknown said...

What a great looking vent for your tiny home. I personally have been thinking about being able to have a house like this, and the experiences that come with it. Something that really is interesting is that there are so many different kind of things that can happen to ensure that you are able to have a functional house with less square footage. I personally am curious as to whether this kind of work on the roof was something that required a contractor, or if this was something that can be done on your own, but with permits? Thank you for sharing. http://www.americanbuildingandroofing.com

Robert said...

This is a wonderful article, Given so much info in it, These type of articles keeps the users interest in the website,... you can find out more

Bronx Sewer Cleaning said...

Great post! Thanks for sharing.

historypak said...

I'm glad I found this web site, I couldn't find any knowledge on this matter prior to.Also operate a site and if you are ever interested in doing some visitor writing for me if possible feel free to let me know, im always look for people to check out my web site. Plumbing services london

Unknown said...

Thank you very much for writing such an interesting article on this topic. This has really made me think and I hope to read more.
plumber tampa

Unknown said...

I have read your article. it is very informative and helpful for me.I admire the valuable information you offer in your articles. Thanks for posting it..
Plumber Rhode Island

Unknown said...
This comment has been removed by a blog administrator.
Anonymous said...

I am sorry for taking so long to reply to responses on this article. We have both gone back to work recently. I think a lot of people have a hard time understanding how to plumb their home or tinyhouse. We did our plumbing a bit unconventionally because of the obvious size constraints and also to simplify the entire process. I am trying to get Chrissy to update the blog to explain the ins and outs of everthing..... or maybe a walk-through video. We need something to show everyone how our solutions worked out and also how a few things had to be changed or moved. Anyway, stay tuned for a new post soon!

the guy

Anonymous said...

Sorry but, whatever language this is did not automatically get translated so I can't know how to respond????